2002 - Robert Quirk
BUILDING THE BEACH HOUSE
This year was spent building the house I had always dreamed about, on the beach, in the tropics, and in front of a surf break.
Robert Quirk and backhoe on the first day of construction

This was the first day of construction.  I am standing next to the back hoe, getting the lot cleared of brush.   Then it was graded  and leveled.

After the grading, the motorhome was parked on the lot.  I lived in the motorhome for a year, while building the house.

 

 wpe35.jpg (9127 bytes)

 

 

 Tons of steel in the construction

 

The house was built from all block and concrete, so the foundation was critical.  This is the steel that went into the front retaining wall, supporting the house.

 

After the foundation was poured, we compacted the dirt and started raising the walls

  

Compacting the foundation

I Robert Quirk taking a break at night on the computer

I would work on the house all day, and work nights on the computer in the motorhome.

Finally the house was finished in late 2002.   For a full description of the final product, click on the link below.
Beachfront Villa Pescadero

The Beach House came out great!

Robert Quirk 2001  2002 

2003  2005  2006  2007

 

Robert Quirk

Email:    rq@cabohomesandcondos.com

Telephone - 01152(624)142-6244 or Cell:  01152 (624)147-0326 

Km. 28 Carratera Transpeninsular - San Jose del Cabo, BCS, Mexico

Hit Counter